Difference between revisions of "User:Nick H"

From DoyleGroup
Jump to: navigation, search
(To Do)
(Other)
Line 32: Line 32:
 
* Get turbo set up
 
* Get turbo set up
 
* Start preparing for the move
 
* Start preparing for the move
 +
* Talk to Frank about the pit

Revision as of 08:13, 4 May 2010

Future Lablog Entries

  • Rotational Temperatures
    • Need error bars
    • Most important FOM: J=1 population
    • Consistent with simple estimates and simulations
    • _Maybe_ consistent with longitudinal data?
  • Transverse and Longitudinal
    • Vertical binning --> temperatures are consistent
    • Amount of cooling is consistent with beam freezing a few cm downstream
    • Mach number of ~10 is not consistent with this

To Do

Analysis

  • Longitudinal widths
  • 60 and 100 sccm trans widths (with norm)
  • Skimmer transmission - divergence relation
    • Does temp matter?
  • Finish fluor rot temp
  • Plots of J=1 (not normed) after skimmer vs flow

Data taking

  • Re-take 60 sccm long data
  • take 100sccm long data

Other

  • Get turbo set up
  • Start preparing for the move
  • Talk to Frank about the pit