Difference between revisions of "User:Nick H"

From DoyleGroup
Jump to: navigation, search
(To Do)
Line 9: Line 9:
  
 
== To Do ==
 
== To Do ==
 +
 +
* Re-take 60 sccm long data
 +
* take 100sccm long data

Revision as of 20:01, 1 May 2010

Future Lablog Entries

  • Rotational Temperatures
    • Need error bars
    • Most important FOM: J=1 population
  • Transverse and Longitudinal Stuff
    • Amount of cooling is consistent with beam freezing a few cm downstream
    • Mach number of ~10 is not consistent with this

To Do

  • Re-take 60 sccm long data
  • take 100sccm long data